OilField HandyCalc
Detailed App Info:
Application Description
Oilfield Handy aims to ease the life of Oilfield personnel and Petroleum, Mud Engineers by providing various on-hand calculations. It is meant for Engineers involved in Oil and Gas exploration and Drilling. This application is an essential tool out in the Oilfield. Oil & Gas Calculations. Export your Calculation Results on Email or share with colleagues. Below Calculations are covered. Please email us on support@saifysolutions.org, for clarifications or corrections.
Drill String Volume in bbls
Annular Volume in bbls
Strokes – Surface to Bit
Strokes – Bit to surface or “Bottoms Up”
Total Stokes – Kelly to Shaker
Slug Calculation – Length of DRY Pipe
Slug Weight Calculation – Length of DRY Pipe
Accumulator Capacity — Usable Volume Per Bottle
Control Drilling – Maximum Drilling Rate feet per hour
Bulk Density of Cuttings (Using Mud Balance)
Drill String Design (Limitations)
Ton-Mile (TM) Calculations
Cementing Calculations
Weighted Cement Calculations
Calculations for the Number of Sacks of Cement Required
Calculations for the Number of Feet to Be Cemented
Setting a Balanced Cement Plug
Increase Oil/Water Ratio
Decrease Oil/Water Ratio
Hydraulicing Casing
Depth of a Washout
Lost Returns — Loss of Overbalance
Stuck Pipe Calculations
Calculations Required for Spotting Pills
Pressure Required to Break Circulation
Tags : United States, Kuwait, India, Canada, Indonesia, Russia, France, Oil Company, Petroleum, Oil & Gas, Mud, Cement
Drill String Volume in bbls
Annular Volume in bbls
Strokes – Surface to Bit
Strokes – Bit to surface or “Bottoms Up”
Total Stokes – Kelly to Shaker
Slug Calculation – Length of DRY Pipe
Slug Weight Calculation – Length of DRY Pipe
Accumulator Capacity — Usable Volume Per Bottle
Control Drilling – Maximum Drilling Rate feet per hour
Bulk Density of Cuttings (Using Mud Balance)
Drill String Design (Limitations)
Ton-Mile (TM) Calculations
Cementing Calculations
Weighted Cement Calculations
Calculations for the Number of Sacks of Cement Required
Calculations for the Number of Feet to Be Cemented
Setting a Balanced Cement Plug
Increase Oil/Water Ratio
Decrease Oil/Water Ratio
Hydraulicing Casing
Depth of a Washout
Lost Returns — Loss of Overbalance
Stuck Pipe Calculations
Calculations Required for Spotting Pills
Pressure Required to Break Circulation
Tags : United States, Kuwait, India, Canada, Indonesia, Russia, France, Oil Company, Petroleum, Oil & Gas, Mud, Cement
Requirements
Your mobile device must have at least 911.13 KB of space to download and install OilField HandyCalc app. OilField HandyCalc is available on iTunes for $7.99
If you have any problems with installation or in-app purchase, found bugs, questions, comments about this application, you can visit the official website of Aliasgar Rangwala at http://www.saifysolutions.org.
Copyright © 2014